Abstract

The way enterprise capabilities are used decides about its competitiveness among other ones. In that context modeling aimed at production tasks allocation planning plays a crucial role especially at concurrently executed production orders. The introduced reference model employing constraint programming (CP) paradigm describes both an enterprise and a set of project-like production orders. Moreover, encompassing consumer orders requirements and available production capabilities, the model provides the formal framework allowing one to develop a class of decision support systems aimed at interactive production process planning subject to multiproject environment constraints. In that context our contribution is a knowledge-based and CP-driven approach to resource allocation assuming precise character of decision variables. The conditions sufficient for deadlock avoidance are the main goal. The conditions delivered provide formal framework for developing a task oriented Decision Support Tool for Project Portfolio Prototyping (DST4P, Banaszak 2006). The tool provides a prompt and interactive service to a set of routine queries formulated either in straight or reverse way.

References

Bach I., Bocewicz G. & Banaszak Z. (2008a). Constraint programming approach to time-window and multiresource-constrained projects portfolio prototyping. In: Nguyen N.T., Borzemski L., Grzech A. & Ali M. (Eds.), New Frontiers in Applied Artificial Intelligence. IEA/AIE 2008. Lecture Notes in Artificial Intelligence, 5027, pp. 767–776. Berlin–Heidelberg: Springer. DOI: https://doi.org/10.1007/978-3-540-69052-8_80.

Bach I., Wójcik R. & Bocewicz G. (2008b). Projects portfolio prototyping subject to imprecise activities specification. In: Proceedings of the 14th International Congress of Cybernetics and Systems of WOSC – ICCS’08, pp. 261–272. Wrocław.

Banaszak Z.A. (2006). CP-based decision support for project driven manufacturing. In: Józefowska J. & Węglarz J. (Eds.), Perspectives in Modern Project Scheduling. International Series in Operations Research & Management Science, 92, pp. 409–437. Boston, MA: Springer. DOI: https://doi.org/10.1007/978-0-387-33768-5_16.

Banaszak Z.A., Zaremba M.B. & Muszyński W. (2005). CP-based decision making for SME. In: Horáček P., Šimandl M. & Zítek P. (Eds.), Proceedings of the 16th IFAC World Congress, Prague, Czech Republic, pp. 319–324. IFAC Proceedings Volumes, 38(1). DOI: https://doi.org/10.3182/20050703-6-CZ-1902.01475.

Barták R. & Erben R. (2004). Incomplete depth-first search techniques: A short survey. In: Barr V. & Markov Z. (Eds.), Proceedings of the 17th International Florida Artificial Intelligence Research Society Conference – FLAIRS 2004, pp. 257–262. Menlo Park, CA: AAAI Press.

Beale E.M.L. (1979). Branch and bound methods for mathematical programming systems. In: Hammer P.L., Johnson E.L. & Korte B.H. (Eds.), Discrete Optimization II. Annals of Discrete Mathematics, 5, pp. 201–219. Amsterdam: North-Holland. DOI: https://doi.org/10.1016/S0167-5060(08)70351-0.

Bocewicz G., Wójcik R. & Banaszak Z. (2007). Design of admissible schedules for AGV systems with constraints: A logic-algebraic approach. In: Nguyen N.T., Grzech A., Howlett R.J. & Jain L.C. (Eds.), Agent and Multi-Agent Systems: Technologies and Applications. Lecture Notes in Artificial Intelligence, 4496, pp. 578–587. Berlin–Heidelberg: Springer. DOI: https://doi.org/10.1007/978-3-540-72830-6_60.

Linderoth J.T. & Savelsbergh M.W.P. (1999). A computational study of search strategies for mixed integer programming. INFORMS Journal on Computing, 11(2), pp. 173–187. DOI: https://doi.org/10.1287/ijoc.11.2.173.

Chanas S. & Kamburowski J. (1981). The use of fuzzy variables in PERT. Fuzzy Sets and Systems, 5(1), pp. 11–19. DOI: https://doi.org/10.1016/0165-0114(81)90030-0.

Dubois D., Fargier H. & Fortemps P. (2003). Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge. European Journal of Operational Research, 147(2), pp. 231–252. DOI: https://doi.org/10.1016/S0377-2217(02)00558-1.

Martínez E.C., Duje D. & Pérez G.A. (1997). On performance modeling of project-oriented production. Computers & Industrial Engineering, 32(3), pp. 509–527. DOI: https://doi.org/10.1016/S0360-8352(97)00005-3.

Puget J.-F. (1994). A C++ implementation of CLP. In: Proceedings of SPICIS’94, Singapore. ILOG Technical Report 94-01.

Schulte C., Smolka G. & Würtz J. (1998). Finite Domain Constraint Programming in Oz: A Tutorial. DFKI Oz Documentation Series. Saarbrücken: German Research Center for Artificial Intelligence and Universität des Saarlandes. URL: https://www.ps.uni-saarland.de/oz2/documentation/.

Sung C.S. (1985). A production planning model for multi-product facilities. Journal of the Operations Research Society of Japan, 28(4), pp. 345–358. DOI: https://doi.org/10.15807/jorsj.28.345.

Van Hentenryck P. (1991). Constraint logic programming. The Knowledge Engineering Review, 6(3), pp. 151–194. DOI: https://doi.org/10.1017/S0269888900005798.

Downloads

Published

2008-12-18

Issue

Section

Articles

How to Cite

Banaszak, Z., Bocewicz, G., & Bach, I. (2008). CP-driven Production Process Planning in Multiproject Environment. Decision Making in Manufacturing and Services, 2(2), 5-32. https://doi.org/10.7494/dmms.2008.2.2.5