Kaczmarczyk, W. (2014) “Modelling Set-up Times Overlapping Two Periods in the Proportional Lot-Sizing Problem with Identical Parallel Machines”, Decision Making in Manufacturing and Services, 7(1), pp. 43–50. doi: 10.7494/dmms.2013.7.1.43.